REFUND & CANCELLATION POLICY
Understanding milestones, engineering deposits, and custom structural steel manufacturing cancellation terms.
Effective Date: October 2026
1. Custom Capital Manufacturing Nature
Every bomb shelter, storm bunker, and hardened steel cabin produced by BombShelters.com is a custom-engineered, build-to-order structural asset fabricated to specific soil, threat, and parcel dimensions. Because raw ASTM steel is laser-cut and welded specifically for each order, cancellation terms reflect committed manufacturing milestones.
2. Preliminary Consultation & Drafting Phase
Initial consultation and conceptual quotes are 100% complimentary. If a formal architectural engineering deposit is paid to create state-stamped CAD blueprints, that deposit covers drafting labor and is non-refundable once engineering stamps are completed.
3. Fabrication Milestone Cancellations
Once structural steel is procured and welding commences:
- Prior to steel cutting: Deposit refunded minus incurred drafting and administrative expenses.
- During active steel welding: Client is responsible for committed materials and labor up to the date of written notice.
- Post-fabrication & coating: Orders cannot be cancelled as units are completed custom pressure vessels.
4. Defect & Warranty Remediations
In the rare event that a shelter does not meet contracted structural specifications, BombShelters.com will immediately repair, replace, or rectify the issue under our Lifetime Structural Warranty.
